TechFlow News: The Ethereum Layer 2 network Base has released a detailed timeline for migrating its testnet from Goerli to Sepolia.
January 19: Deposit functionality on the Base Goerli bridge will be disabled;
January 31: Base documentation will no longer reference Goerli;
February 9: Base Goerli infrastructure (including the Base Goerli bridge user interface) will be shut down.
Base advises users to bridge their testnet funds from Base Goerli to Ethereum Goerli before the infrastructure shutdown on February 9, 2024.




