TechFlow Logo
Login/ Sign up
ETH Gas
Gwei
Fear
gas
7x24hNews

PJM proposes to shorten the data center interconnection study cycle to 12 months.

2026.11.17 - 16:42
Exclusive
Share

TechFlow reports that on November 18, according to Bloomberg, U.S. grid operator PJM has proposed a "fast-track power connection" program, aiming to shorten the review period required to connect data centers to its 13-state grid from 24 months to 12 months.

The program will conduct parallel reviews of proposed power plants and transmission infrastructure upgrades. PJM has submitted the proposal to the U.S. Federal Energy Regulatory Commission to address pressures from rising electricity demand and grid connection delays.

Add to Favorites
Share to Social Media