Morgan Stanley: Blades and Impellers Become New Bottleneck for AI Power Supply, SpaceX Builds Own Foundry to Break Through Compute Scale Ceiling
TechFlow News, according to TechFlow Research, Morgan Stanley's research report on August 16 pointed out that the AI data center computing power competition is shifting from chips to electricity, with gas turbine blades and impellers becoming the new bottleneck. Only three foundries globally can produce large gas turbine hot-end blades and impellers, and orders are booked until 2030. SpaceX built a new foundry in Bastrop, Texas, meeting the demand for both data center turbines and Starship Raptor engine turbopumps through vertical integration. SpaceX has secured approximately 3 to 4 GW of gas turbine supply, with total publicly disclosed commitments approaching 8 GW. Musk proposed a 10 GW computing power target by the end of 2027; Morgan Stanley currently models only 5 GW, with the gap lying in the timeliness of power supply.
The research report judges that each GW of computing power represents an annual revenue opportunity of approximately $50 billion. Morgan Stanley maintains an overweight rating and a $300 price target for SpaceX, with an SOTP breakdown of $18 for Space business, $118 for Connectivity, $8 for X and Grok, and $165 for Enterprise AI. The current stock price is approximately $141, with the market pricing Enterprise AI at only about $13, approximately 1x 2028 EV/Revenue. Morgan Stanley believes the pullback after the lock-up expiration provides an entry window; if SpaceX can prove it will push computing power to 5 GW or higher by the end of 2027, the Enterprise AI business valuation will be significantly revised upward.





