TechFlow reports, on August 7, SpaceX collaborated with Tesla, with an initial investment of $16.8 billion (approximately 113.605 billion yuan), to build the Terafab advanced AI chip manufacturing base in Grimes County, Texas. In response to environmental concerns, SpaceX promised that factory operations would not drive up electricity costs, deplete water sources, or cause the water level of the Navasota River to drop. The factory will build its own natural gas power plant and ultra-large battery array for power supply, rather than connecting to the ERCOT main grid, ensuring an independent energy supply system and reducing reliance on local power infrastructure.
Add to Favorites
Share to Social Media





